New Worship Center
Roswell Assembly History
Listen to an interview with our former Pastor Doug Kinder and see some photos of the people who made our first building possible.
More...
Outdoor Rendooring
Outdoor Rendooring
This rendering is to give an image of the front of the new worship center at sunset.
Main Level Floor Plan
Main Level Floor Plan
This is the floor plan for the bottom floor. The new building is located in the bottom left. Notice the much larger foyer and new sanctuary able to fit 350 people.
Upper Level Floor Plan
Upper Level Floor Plan
A look at the upstairs portion of the new building. It will have an elevator for handicapped accessibility, as well as new classrooms and staff offices.
Front Of Building Design
Front Of Building Design
This is a architectural look at the front of the new building.
Building Design facing Crabapple
Building Design facing Crabapple
This is the architectural look of the building as it faces Crabapple Road.
Funds Raised towards Start Construction Goal
Funds Raised towards Start Construction Goal
The funds needed to initiate the construction phase is $550,000 and to complete construction and move into the new building is $650,000.
 
Pause
Capital Campaign Progress

“Reaching Our World For Christ” Capital Campaign is to help raise the needed funds for our new worship center, classrooms, gathering spaces, and increased parking.  This expansion will give room for growth in all areas from children and youth to adults and senior adults.  The thrust of this campaign lines up with the Mission and Purpose of our church which is to Reach our world, Grow disciples, Equip leaders & workers and to Serve others.    Also 10% or what is raised through this campaign will be donated to missions both here and overseas as we continue...

“Reaching Our World for Christ”!